Start Slideshow
- Copenhagen International School Nordhavn by CF Moller<a href="http://inhabitat.com/tag/c-f-moller/" target="_blank">C.F. Møller Architects</a> just unveiled plans for the Copenhagen International School (CIS), a massive solar-powered building that will be Copenhagen’s largest school when it's complete. The 25,000-square-meter school will be built in the city’s Nordhavn district, and it will accommodate 1,200 students and 280 employees. CIS Nordhavn’s roof will be topped with 12,000 angled <a href="http://inhabitat.com/tag/solar-power" target="_blank">solar panels</a> that will supply over half of the school’s annual electricity needs.1
- Copenhagen International School Nordhavn by CF MollerTo mitigate the project’s large size and formidable programming requirements, C.F. Møller Architects divided the main building into four smaller and interconnected towers.2
- Copenhagen International School Nordhavn by CF MollerLocated on the water’s edge, CIS Nordhavn is sandwiched between the public waterfront and Copenhagen’s urban fabric.3
- Copenhagen International School Nordhavn by CF MollerEach tower, which ranges from five to seven stories, boasts different designs and layouts that best accommodate different grades and student age groups.4
- Copenhagen International School Nordhavn by CF MollerThe four school units are set atop a two-story ground-floor base that houses common-use facilities such as the gymnasiums, cafeteria, library, and performance spaces.5
- Copenhagen International School Nordhavn by CF MollerSince these facilities are separate from the classrooms, the students or local community can still make use of those spaces outside of normal school hours.6
- Copenhagen International School Nordhavn by CF MollerOver half of CIS Nordhavn’s electricity will be supplied by a 6,048-square-meter solar array that is estimated to produce over 200 MWh per year.7
- Copenhagen International School Nordhavn by CF MollerThe school will also incorporate the solar cells into a permanent part of the school’s curriculum. Students will be able to monitor energy production and use the data in their physics and math classes.8
- Copenhagen International School Nordhavn by CF MollerThe school is now under construction with an expected completion date of 2017.9