Start Slideshow
Adobe Utah Campus-WRNS StudioAfter <a href="http://www.adobe.com/" target="_blank">Adobe's</a> acquisition of Utah-based Omniture in 2009, they set out to build themselves a <a href="http://blogs.adobe.com/adobelife/2012/11/05/adobes-new-utah-campus-opens-its-doors/" target="_blank">new campus</a> that would encourage creativity and help further motivate their employees. Adobe hired WRNS Studio to design the 280,000 sq ft campus and brought on <a href="http://raptstudio.com/" target="_blank">RAPT Studio</a> to handle the interiors. Aiming for LEED Gold certification, the project connects its employees with the outdoors via lots of exterior spaces and large expanses of glass that provide views and daylighting throughout the building.1
Adobe Utah Campus-WRNS StudioLocated about half an hour south of Salt Lake City in Lehi, UT is <a href="http://www.facebook.com/AdobeInUtah" target="_blank">Adobe's new campus</a>.2
Adobe Utah Campus-WRNS StudioSituated right next to I-15 and public transit, the center is centrally located between major population centers and a highly educated working class from the Provo area.3
Adobe Utah Campus-WRNS StudioViews of the Utah valley spread out in front of the 38 acre campus with the Wasatch Mountains directly in the background.4
Adobe Utah Campus-WRNS StudioThe goal of the campus was to create a space with lots of energy to foster creative work.5
Adobe Utah Campus-WRNS StudioAdobe also wanted to create a strong connection with the outdoors.6
Adobe Utah Campus-WRNS StudioThey achieved this with lots of outdoor drought tolerant garden space, a glass curtain wall envelope with views to the mountains and valley and access to daylight for everyone.7
Adobe Utah Campus-WRNS StudioThe contemporary campus opened for business in November of 2012 with one of the three long linear buildings and shared amenities building.8
Adobe Utah Campus-WRNS StudioThe eco office also includes café, fitness center, basketball court, a rock climbing wall and a central gathering atrium with tables, billiards, ping pong and more.9
Adobe Utah Campus-WRNS StudioFlexible and open spaces encourage collaboration and the central atrium acts as the heart of the project.10
Adobe Utah Campus-WRNS StudioThe campus won't be complete until the other two buildings are complete.11
Adobe Utah Campus-WRNS Studio<a href="http://www.wrnsstudio.com/" target="_blank">WRNS Studio</a>, <a href="http://raptstudio.com/" target="_blank">RAPT Studio</a> and <a href="http://www.adobe.com/corporate-responsibility/environment.html" target="_blank">Adobe</a> are targeting LEED Gold certification, which includes the use of energy efficient <a href="http://www.deseretnews.com/article/865568252/A-look-inside-Adobes-new-state-of-the-art-Utah-home.html?pg=all" target="_blank">heat exchangers</a> that pull heat from data servers to help warm the building.12
Adobe Utah Campus-WRNS StudioSite plan for Adobe's Utah Campus.13
Adobe Utah Campus-WRNS StudioGround floor plan of the Amenities Building and the first office tower.14
Adobe Utah Campus-WRNS Studio[gallery_extend]....<br><br><a href='https://inhabitat.com/adobes-new-leed-gold-designed-campus-connects-with-the-outdoors-in-utah/'>READ ARTICLE</a>15















